Confirming that the system meets the requirement as written, using the requirement's verification method against its acceptance criteria. A verification lead independent of the implementer moves a requirement to verified. Compare validation.
See also: Validation, Verification method, Acceptance criteria
Interim definition. BLORP takes this term over when the global ontology lifts from Phase-0.