Where a requirement sits in the decomposition. One of: business, stakeholder, system or software.
See also: Requirement, Requirement type
Interim definition. BLORP takes this term over when the global ontology lifts from Phase-0.
Where a requirement sits in the decomposition. One of: business, stakeholder, system or software.
Where a requirement sits in the decomposition. One of: business, stakeholder, system or software.
See also: Requirement, Requirement type
Interim definition. BLORP takes this term over when the global ontology lifts from Phase-0.
Continue exploring our knowledge base
A statement of what the system must do, or the constraint it must respect, in the target state. It is written with one "shall", one subject (the system or a role) and one behavior, and carries an id, a type, a level, an owner role, a scope, a rationale, a source, a verification method with acceptance criteria, a priority, a phase and a lifecycle status.
A named field every requirement carries: id, title, statement, type, level, owner, scope, rationale, source, priority, phase, status, verification, validation, risk, medical flags, trace, and change history and baseline. Together the attributes are the requirement ontology of the Analysis Document Standard.
The kind of a requirement. One of: business, stakeholder, functional, quality, service-level, security, regulatory, constraint, architecture, interface, data, operation or risk-control.
The requirement owner is a role taken from the role register, never a person. Every requirement has an owner role, such as the business owner, the PHI owner or the platform owner. A person's name appears only in the role register, as the current holder of the role.
The list of roles in an analysis document with the person who currently holds each. It is the only place a person's name appears; owners, approvers, actors and stakeholders everywhere else are named by role.